American Energy Conservation and Solar Generation Pioneer Provides almost daily directory of Green Energy News and Commentary. Discussions, regarding conservation, weatherization, solar DHW, Solar PV and Wind and Green Careers._Green Earl, Founder American Energy Conservation Group Redding/Las Vegas/Sacramento, Ca 530-604-6394 earlallenboek@gmail.com Still Producing NegaWatts...Since 1981
Friday, July 3, 2009
World's Largest Solar Thermal Plant (340MW) Planned For Arizona
Solar, Wind, Bio, Energy News And Commentary By_Green Earl, 30 year Pioneer In Conservation & Solar Energy
Just in case if you didn't already know; www.CleanTechnica.com features latest clean tech energy info.
This one is directly about our State of Arizona
http://cleantechnica.com/2009/05/13/worlds-largest-solar-thermal-plant-340mw-planned-for-arizona/
World’s Largest Solar Thermal Plant (340MW) Planned for Arizona
Written by Jake Richardson
Published on May 13th, 2009
The Mohave Sun Power company is planning a project in Mohave County that could begin construction in the fourth quarter of 2010.
It will use 4,000 acres of land and employ concentrating solar power. Molten salt will be the storage medium.
* » See also: EarthEra Trust Amasses $18M for Renewable Energy Projects
* » Get CleanTechnica by RSS or sign up by email.
Mitchell Dong, the company’s CEO explained the technology, “It’s a parabolic trough, or a ‘U’-shaped mirror that reflects or concentrates the sunlight by a factor of 100 to this thin tube of transfer fluid. In this case, it’s a synthetic oil heated to 800 degrees by the sun’s light. There are rows and rows of these collectors and this 800 degree oil is pumped to a central power block, a central location where that hot oil goes to a boiler. It makes steam and drives a single steam turbine.” Of course the whole installation would use many arrays of parabolic troughs.
Energy generated by the plant would be purchased by California, Nevada, Arizona and Colorado. If the planning and construction processes go smoothly the plant could starting producing electricity by 2013. The planning actually has been going on for some time: “We have been working on this for over a year,” said Mohave County Supervisor Buster Johnson. (Mohave County has already had a different 200 MW project planned for construction.) This larger one will depend upon federal stimulus money for financing.
If approved and funded, the project could generate an estimated 1,500 jobs during the construction phase, and require 100 employees when operational. Such a large plant would also generate local tax revenues. Construction cost is estimated at two billion dollars.
(A nuclear power project requiring two reactors could cost 17 billion.)
In addition to the planning and funding challenges, the project must address the need for a large amount of water used for cooling purposes. The current solar power capacity of the US is over 9,000 MW, and it is growing steadily.
Image Credit: Richard Montoya, Public Domain
-------------------------------------------------------------------------
This email was sent to 116 members of YESWECANSOLVEIT
This email was sent from cvismeg@yahoo.com
Listserv email address: YESWECANSOLVEIT@groups.barackobama.com
Your reply will be sent to: YESWECANSOLVEIT@groups.barackobama.com
Unsubscribe or change your email settings: http://my.barackobama.com/page/group/YESWECANSOLVEIT/listserv-unsub
-------------------------------------
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment